Stacker Rebuilds Do your loads have to go to the aerator before moving along in your production process? If so, we can help you eliminate that step by upgrading your Stacker Bay. Our Side Joggers, Frontstops and Auto Pile Lowering assemblies can usually be retrofitted to your existing piler frames. Take a look at the upgrade we did below. Our customer was sending every load from his existing stacker bay to the aerator before moving them to the presses. This process was streamlined due to the excellent stack quality our Side Joggers and Frontstops have given them. Generally, the costs of performing this upgrade will start at about $ 6,000. Customer's Existing Stacker Before AJE Upgrade - Note the poor Jog quality.
The Top View of the Stacker after new Side Joggers and Frontstops were installed. Each Side Jogger Blade travels on individual carriages across the machine. The Frontstop Carriage travels along a separate carriage in the direction of flow.
The Downstream View of the Stacker with Forks Extended
Our Side Joggers and Frontstops in Action
The Finished Stack on its way to the Press
|
|